Bridge 1760 is located on State Road PR-867 at Km 7.00, crossing an unnamed channel in the Municipality of Toa Baja. In the aftermath of Hurricane Maria, the bridge suffered extensive scour damage to its abutments and piles, with the erosion reaching critical levels. The piles were exposed, and the middle segment of the bridge lost support from the abutment, causing significant settlement. In response to the emergency, Integra was commissioned to design a temporary modular bridge, which was successfully completed in May 2024.